Annual Asphalt Overlay Project
Thursday, October 30, 2008
The city of St. Charles Public Works Dept. will be conducting its Annual Asphalt Overlay Project over the next month. During this time the affected streets and alleys will be milled, a process which removes the top two inches of asphalt, and subsequently overlaid with two inches of asphalt. This work, on average, will only take several hours, spread over many days. In addition to the asphalt overlay, there will be some streets and alleyways which may require preliminary work such as base repair and/or crack repair. This work is weather dependant and any delay shall push the schedule back accordingly. See map (PDF file, 213 KB).
Both streets and alleyways shall be posted no later than 48 hours prior to the start of operations. During the posting residents are asked not to park their vehicles on the street or alleyway; any vehicle left on the street shall be towed at the owner’s expense. Below is a preliminary schedule of milling and overlay for streets and alleyways:
Milled Oct. 29, 30, 31; Nov. 1
Overlaid Nov. 4, 5, 6
Concordia from Park to Randolph St.
Cherokee Ln. from Concordia Ln. to (End)
Westminster Dr. from Concordia Ln. to Cherokee Ln.
Wendover Ln. from Cherokee Ln. to Westminster Dr.
Du Sable from Cherokee Ln. to (Cul-de-sac)
Larkspur Ct. from Cherokee Ln. to (Cul-de-sac)
Ridgeview Dr. from Concordia Ln. to (Cul-de-sac)
Milled Nov. 3, 4, 5, 6, 7
Overlaid Nov. 7, 8, 10, 11, 12, 13
Sibley from Rebecca Dr. to Kingshighway
Pam Ave. from Sibley St. to Elm St.
Keith Dr. from Sibley St. to Elm St.
Rebecca Dr. from Birchtree Dr. to El Camino Dr.
Rebecca Dr. from Holiday Dr. to Sibley St.
Rebecca Ct. from Rebecca Dr. to Rebecca Dr.
Kingshighway from Jefferson St. to Clark St.
Milled Nov. 7, 8, 10, 11, 12, 13
Overlaid Nov. 14, 15, 17, 18, 19, 20, 21, 22
Droste Rd. from Zumbehl Rd. to Duchesne Dr.
Hyannis Ct. from Droste Rd. to Droste Rd.
Mayer Dr. from Duchesne Dr. to Nancy Dr.
Mayer Dr. from Yale Blvd. to Norma Dr.
Norma Dr. from Droste Rd. to Rebecca Dr.
Pam Ave. from Peggy Pl. to Droste Rd.
Rebecca Dr. from Norma Dr. to Mayer Dr.
Warwick Dr. from Zumbehl Rd. to (Governor’s Place)
REVISED SCHEDULING WILL BE RELEASED WHEN AVAILABLE.