  1. 100 Block Howard Storm Sewer

    The City intends to remove and replace 300' of failing metal, clay and concrete pipes with new, and possibly larger, sewer pipe.

    Link to page
  2. Lindenwood Avenue Culvert Replacement

    This culvert was identified as a high priority replacement after an inspection in 2013. The project will replace a deteriorated 6' diameter CMP.

    Link to page
  3. Convention Center Parking Lot Repairs

    Two-phase project to assess and repair problems in the Convention Center Parking Lot.

    Link to page
  4. Elm Point Industrial Traffic Flow Improvement

    The Elm Point Traffic Improvement Project is intended to relieve overall congestion by adding additional through and turn lanes.It will also implement new ADA approved sidewalks.

    Link to page
  5. Public Works Facility Construction

    The Public Works Facility Design Task Force reviewed 10 bid proposals for the Public Works Facility project at their June 10, 2014 meeting.

    Link to page
  6. Silvertrail Traffic Calming

    Traffic calming incorporates engineering design and management strategies that balance vehicular traffic on streets with other uses. Engineers explore and implement traffic calming techniques that lessen the impact of motor vehicle traffic by slowing it down, or literally “calming” it