Missouri Highway 370 Pedestrian Bridge

Impacted Ward: 1

Contractor: Pace Construction Co., LLC

Project Description 

This project will install barrier separated, bicycle pedestrian paths on the Missouri Highway 370 bridge protecting bicyclists and pedestrians that cross from Saint Charles to Saint Louis County. Currently bicyclists and pedestrians are not shielded from high speed traffic along this route making it uncomfortable to use the crossing. When complete, the project will connect the Katy Trail on the Saint Charles side of the river to the Riverwoods Trail in Bridgeton.

Project Location

Missouri Highway 370 across the Missouri River
Project Map

Contact Information

Tim Rohrbacker
Project Manager
636-949-3237
Tim.Rohrbacker@stcharlescitymo.gov 

Project Activities

  • Project Charter approved in April 2016
  • Project Open House was held on September 28 2018 at Saint Charles City Hall
  • MoDOT tested the barrier wall machine in mid-March. MoDOT maintenance suggested some extra installments done before completion. The Contractor is waiting on materials to be manufactured and could cause overall project delays. 
  • Project expected to be completed by Summer of 2020.