Cole Creekbank Stabilization at Huntington Downs

Construction Ward - 10

Project Description

Erosion to a section of Cole Creek has caused the bank to slide near a 27 inch sanitary sewer trunkmain. The sanitary main does not appear to be affected by the slope failure, but stability analysis does show a potential for failures to the main. This project will stabilize the slope and line the trunkmain.

Project Location

Approximately 150 foot long section of Cole Creek behind 178 Huntington Downs

Contact Information

Matt Seggerman
Project Manager
636-949-3237

Current Project Activities

  • The City is currently in the design stage of the project
  • Project charter approved on April 20, 2018
  • Survey notice issued on September 5, 2018
  • Survey approved on October 4, 2018

Project Timeline

huntington downs timeline

Project Progress

huntington downs progress