Crystal Springs Creek Bank Stabilization between Rio Vista and S River Road

Impacted Wards - 3

Design Consultant: Intuition & Logic

Contractor: Fischer Grading


Project Description

A reach of Crystal Springs Creek between Rio Vista Drive and S River Road is experiencing active widening on the left descending bank. Adjacent parking lots and structures are threatened by bank erosion, as well as sanitary sewer and water infrastructure. A section of sanitary sewer in the left bank near 301-321 San Juan Drive was previously exposed by bank erosion and an emergency repair was done to prevent further damage to the sewer. The project includes construction of two retaining walls, bank stabilization using rock and native plants, and new sanitary sewers.

Project Location

Crystal Springs Creek Bank Stabilization from Rio Vista Dr. to S. River Rd.
Location Map 3

Contact Information

Todd Strong
Project Manager
636-949-3594
Todd.Strong@stcharlescitymo.gov

Project Activities

  • Easement acquisitions are nearly complete. Final plans being prepared.
  • As of April, 2022, construction is pending while issues are resolved with the contractor.