Bridle Spur Culvert Replacement Project

The Purpose

The Bridle Spur Culvert Replacement project was identified in the City’s Long Range Stormwater Plan in 2016. The goal of this project is to reduce the risk of property damage and pipe collapse due to the presence of a deteriorated metal pipe culvert within a section of the Diekamp Homestead subdivision.

Location

Bridle Spur Lane between Maple Tree Drive and Apple Blossom Lane

Improvements

  • New, larger concrete pipes will be constructed to replace deteriorated ones.
  • Overflow structure will be added to allow upstream area to drain. 
  • Metal storm sewer pipes that run through backyards between Maple Tree Drive and Apple Blossom Lane will be rehabilitated by installing a structural pipe liner. Trenchless methods will be used to minimize construction disturbance to property owners.

Bridle Spur between Maple Tree Drive and Apple Blossom Lane will be temporarily closed for construction. Detours will be established (see Detour Exhibit below). 

Schedule

Construction anticipated to start in May or June of 2021 and will take up to 6 months. 

Related Documents

Contact Information

Jonathan Swagman
Project Manager
Department of Engineering
Jonathan.Swagman@stcharlescitymo.gov


Existing culvert
Trenchless Rehab-Pipe Lining